Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com

Large-scale 341-unit multifamily development with coordinated plumbing infrastructure across residential units, parking structure, and amenity spaces requiring high-density vertical distribution.
Systems Installed:
– Plumbing systems (domestic, sanitary, storm)
– Gas piping systems
– Mechanical connections and condensate systems
– Snow melt
Project Highlights:
– Urban infill construction constraints
–

Water treatment facility supporting mission-critical operations at Hill Air Force Base requiring continuous operation and high-reliability utility systems.
Systems Installed:
– Process piping systems
Project Highlights:
– Mission-critical federal infrastructure
– Continuous operational demand
– High-reliability system requirements

Overview:
High-end restaurant tenant improvement with plumbing systems supporting a full commercial kitchen and high-volume food service operations.
Systems Installed:
– Plumbing systems (domestic and sanitary)
– Grease waste systems
– Equipment connections
Project Highlights:
– Commercial kitchen infrastructure
– Grease-intensive systems
– Downtown retrofit conditions

Overview:
New commercial shell building providing base plumbing infrastructure for future tenant build-out and flexible occupancy use.
Systems Installed:
– Plumbing systems (domestic and sanitary)
– Tenant utility stub-outs
– Gas piping systems
Project Highlights:
– Core-and-shell delivery
– Future tenant flexibility
– Base utility infrastructure

Overview:
Veterinary hospital with specialized clinical plumbing and mechanical systems supporting treatment, surgical, and animal care operations.
Systems Installed:
– Plumbing systems (domestic and sanitary)
– Medical gas systems
– Medical vacuum systems
– Floor drains and wash down systems
Project Highlights:
– Clinical veterinary environment
– Specialized medical utility systems
– Infection cont

Overview:
Dental office with specialized plumbing systems supporting treatment rooms and dental equipment infrastructure.
Systems Installed:
– Plumbing systems (domestic and sanitary waste)
– Medical vacuum
– Medical air systems (certified)
– Equipment connections
Project Highlights:
– Medical-grade dental systems
– Treatment room coordination
– Equipment-driven layout

Overview:
Commercial shell building providing base plumbing systems for future with tenant improvements and flexible commercial use.
Systems Installed:
– Plumbing systems (domestic and sanitary waste)
– Tenant stub-outs
Project Highlights:
– Flexible shell structure
– Future tenant adaptability
– Base utility installation

Overview:
Shared commercial kitchen designed for multiple food vendors requiring high-capacity plumbing and grease management systems.
Systems Installed:
– Plumbing systems (domestic and sanitary)
– Grease waste systems
– Floor and trench drainage systems
– Equipment connections
Overview:
Commercial shell building providing base plumbing systems for future tenant improvement and flexible commercial

Overview:
Occupied veterans care facility remodel with plumbing upgrades completed in an active institutional environment.
Systems Installed:
– Plumbing systems (domestic and sanitary waste)
Project Highlights:
– Occupied elder care environment
– Phased construction sequencing
– Minimal disruption requirements

Overview:
Automotive service facility remodel with utility modifications supporting service bays and equipment operations.
Systems Installed:
– Plumbing systems (domestic and sanitary)
– Compressed air systems
– Utility connections
Project Highlights:
– Automotive service infrastructure
– Equipment-driven systems
– Retrofit conditions

Municipal facility remodel with plumbing and mechanical system upgrades performed within an civic building environment.
Systems Installed:
– Large Scale mechanical room
– Domestic water distribution
– Sanitary waste and vent systems
– Mechanical system tie-ins
– Fixture replacements
Project Highlights:
– Phased construction coordination

Two-building commercial shell development providing base plumbing and mechanical infrastructure for future warehouse and flex-space tenant build-outs.
Systems Installed:
– Domestic water distribution
– Sanitary waste and vent systems
– Roof drainage systems
– Tenant stub-outs
– Gas piping
Project Highlights:
– Multi-building shell development
– Industrial/flex-space readiness
– Scalable infrastructur

Remodel of an existing school facility from classroom to educational lab space. Completed within strict time constraints.
Systems Installed:
– Domestic water distribution
– Sanitary waste and vent systems
– Acid waste and vent systems
Project Highlights:
– Electrofusion acid waste piping system
– In-ground acid waste neutralizer
– Final water connections of chemical fume hoods

Office tenant improvement within an existing commercial building requiring plumbing and mechanical modifications to accommodate updated floor layouts and tenant use.
Systems Installed:
– Domestic water distribution
– Sanitary waste and vent systems
Project Highlights:
– System modification vs full replacement
– Tenant layout adaptation

Stadium addition and remodel on a school campus, upgrading plumbing systems to support athletic facilities, concessions, and event operations.
Systems Installed:
– Domestic water distribution
– Drain waste and vent systems
Project Highlights:
– Outdoor/public facility coordination

Overview:
Emergency water system replacement within an occupied senior living facility requiring rapid response and service restoration without operational disruption.
Systems Installed:
– Plumbing system repair
– Temporary service connections
Project Highlights:
– Emergency response project
– Occupied senior care facility
– Zero-downtime requirement